Tenders FAQ-Technical Questions

     
1- What is the bandwidth for each site?  
 
2- Regarding (SC-01) & (SC-02) can we provide two disks instead of three?  
     
3- In case of unavailability of vendor certified technical education center, a customized training course should be provided?  
     
4- In case no certified technical Instructors are available for some of the modules required, could we offer training outside Egypt?  
     
5- Do you want the trainees to get a certificate from the vendor, stating the completion of their courses or not?  
     
6- What is meant by supports eight separate 2GB/s ports?  
     
7- Can we offer a single 2GB Fiber Channel interface instead of Dual 2GB Fiber Channel interfaces for the tape library.  
     
8- What are the operating systems that need to be supported by the tape library?  
     
9- It is required that the racks should be the same brand as the offered servers? What if we are going to offer different brands?  
     
10- In the Inventory Management Software what is meant by: Negative/Positive Metering: Opposite of Software Metering can be done as well.  
     
11- In the Inventory Management Software what is meant by: Directory Synchronization: Sets up a Synchronization of Files and/or Directories between Computer and Server.  
     
12- In the Remote Desktop Management what is meant by: Real-Word Interface: provide 2-D or 3-D  
     
13- Is it acceptable to provide Larger shared cache per dual-core RISC processors instead of required 8MB cache per processor [ref. ANEX II Page 9 of 74 and 10 of 74]  
     
14- Is it acceptable to provide 4/8 and 2/4 way servers instead of required 4/4 and 2/2 way servers [ref. ANNEX II Page 9 of 74 and 10 of 74 respectively],  
     
15- Can we provide Pre-failure warranty for processor/memory/hard disk but not for power supply and fans as required [ref ANNEX II Pages 12 through 17 of 74],  
     
16- What is meant by Support Global hot-spare to 14 Disk drives [ref. ANNEX II Page 21 of 74],  
     
17- What if the tenderer fails to comply fully with the technical specifications set out in the tender dossier ?  
     
18- What are the consequences for the tenderer if he will answer N (No) for some individual technical specifications?  
     
19- What is number of installed/maximum processors requested in SC-05 and SC-06?  
     
20- Please describe the required way of connection for the SAN switches; the RFP required 3 switches (not an even number).  
     
21- Regarding to (SC-01) page 9/74, Can we provide maximum memory 24GB Instead of 32GB max memory.  
     
22- How many RMON groups are required to be supported (four or nine)?  
     
23- Is the NMS required to manage the Firewall / IDS software on all the routers?  
     
24- An Internet link is required, but no router. Does the router already exist? If yes, what is its type, model and configuration? If no, what are its required specifications?  
     
25- Should Clustered and Network Load Balanced functions be achieved with Windows Enterprise Edition and /or Layer 4 Backbone switch?  
     
26- Is the Back-up software part of scope of LOT1  
     
27- Item 1.2 Server Computer (SC -02), please confirm if it is possible that the total cache will be 4 MB instead of 8MB  
     
28- Item (1.9) Storage Area Network, Please specify if it’s possible to achieve the 8 TB without using the same disk drives  
     
29- Please confirm that it is possible to offer a SAN (Item 1.9) with 4 ports instead of 8 and 2 SAN switches with 16 ports instead of 3 with 8 ports.  
     
30- Regarding SAN (Item 1.9),Could number of LUNs to be 1024 instead 2048 LUN  
     
31- Regarding SAN (Item 1.9), please state the minimum required IOPS  
     
32- Item 1.10 Backup Tape Library, Please confirm that the hot swappable and hot pluggable features are not mandatory.  
     
33- Regarding Personal computers (PC-01) & (PC-02) what is meant by Tower/desktop?  
     
34- Regarding Item 2.6 Storage Management Software (Backup Software) should all servers connected to SAN to be backed-up on-line (hot backup)?  
     
35- In Page # 52 of 74, the backup software to be installed on the (File & Print Server) which are “two clustered servers”, does this means the backup software must be cluster aware and its service fail-over to be enabled inside the cluster services management, and the backup environment’s settings to be on the cluster shared storage.  
 
Questions & Answers  

1-

What is the bandwidth for each site?  
 
  • The 34 remote branches shall be connected with the headquarter. The required bandwidth per remote site is 128 kbps. The Headquarter should be connected using 4 Mbps connection. The service provider shall apply load balance solution for the head quarter links.

  • See Tender Dossier Part II / page 45

 
 

 
2- Regarding (SC-01) & (SC-02) can we provide two disks instead of three?  
 
  • Yes, see Corrigendum III added to tender dossier on the EC web-site and/or Social Fund for Development web-site.
 
 

 
3- In case of unavailability of vendor certified technical education center, a customized training course should be provided?  
  Yes, you could offer customized training courses provided that :

1.Courses must be the original vendor courses in terms of curriculum and

   material.
2.The training should be designed to cover the Hands-On aspects.

3.Training should be flexible in scheduling.

 
 

 
4- In case no certified technical Instructors are available for some of the modules required, could we offer training outside Egypt?  
 
  • Yes, Provided that all expenses are paid by your side.
 
 

 
5- Do you want the trainees to get a certificate from the vendor, stating the completion of their courses or not?  
 
  • Yes, certificate is required.
 
 

 
6- What is meant by supports eight separate 2GB/s ports?  
 
  • The array should be able to support 8 separate ports Fiber channel connections.
 
 

 
7- Can we offer a single 2GB Fiber Channel interface instead of Dual 2GB Fiber Channel interfaces for the tape library.  
 
  • No
 
   
8- What are the operating systems that need to be supported by the tape library?  
 
  • Microsoft Windows Server & Unix at least, also you should provide us with the interoperability matrix regarding all operating system supported by your Tape library.
 
   
9- Is it required that the racks should be the same brand as the offered servers

What if we are going to offer different brands?

 
 
  • It should be of the same brand like the dominant mounted servers.
 
   
10- In the Inventory Management Software what is meant by: Negative/Positive Metering: Opposite of Software Metering can be done as well.  
 
  • That is Checking Licensed Software Running on Desktops, This feature prevent users from running unlicensed software, even when they are offline the network.
  • Offline and Online Metering. Two methods of metering are offered: Passive, where all information is logged locally and no network connections are needed; and Active, which requires a network connection to a shared drive. This helps your administrators choose the method that best fits your organization.
 
   
11- In the Inventory Management Software what is meant by: Directory Synchronization: Sets up a Synchronization of Files and/or Directories between Computer and Server.  
 
  • This feature is for assuring that Number of users accessing the Network, are the same users in the inventory database
  • The Directory Service Synchronization Job is aimed to synchronize the user tree from a selected directory service with the database on the inventory management server
 
 

 
12- In the Remote Desktop Management what is meant by: Real-Word Interface: provide 2-D or 3-D  
 
  • Accessing the Desktops by Clicking on the icon displayed in the 2D map or 3D map.
  • Integration with the Network management Software where administrator can open any desktop from the 2D/3D map on the network management server with no need to open it from the main server.
 
 

 
13- It is acceptable to provide Larger shared cache per dual-core RISC processors instead of required 8MB cache per processor [ref. ANEX II Page 9 of 74 and 10 of 74]  
 
  • See corrigendum III added to tender dossier on the EC web site and/or Social Fund for Development web site
 
 

 
14- Is it acceptable to provide 4/8 and 2/4 way servers instead of required 4/4 and 2/2 way servers [ref. ANNEX II Page 9 of 74 and 10 of 74 respectively],  
 
  • Technical specifications listed in tender dossier are the minimum requested so, if you provide us with specifications that exceed the listed one it will be accepted.
 
 

 
15- Can we provide Pre-failure warranty for processor/memory/hard disk but not for power supply and fans as required [ref ANNEX II Pages 12 through 17 of 74],  
 
  • No, as it is provide an early-warning alert if they detect conditions that could cause an untimely demise
 
 

 
16- What is meant by Support Global hot-spare to 14 Disk drives [ref. ANNEX II Page 21 of 74],  
 
  • It is a global Hot-Spare for the whole system .
 
 

 
17- What if the tenderer fails to comply fully with the technical specifications set out in the tender dossier ?  
 
  •  It will be rejected as nonresposive
 
 

 
18- What are the consequences for the tenderer if he will answer N (No) for some individual technical specifications?  
 
  • It will be excluded
 
 

 
19- What is number of installed/maximum processors requested in SC-05 and SC-06?  
 
  • Number of installed processors: 2
  • Number of maximum processors: 2 or 4
 
 

 
20- Please describe the required way of connection for the SAN switches; the RFP required 3 switches (not an even number).  
 
  • See Tender Dossier Part II / Figure: 1 / Page 5
 
 

 
21- Regarding to (SC-01) page 9/74, Can we provide maximum memory 24GB Instead of 32GB max memory.  
 
  • No, it is not possible.
 
   
22- How many RMON groups are required to be supported (four or nine)?  
 
  • Supports 4 groups of embedded RMON (history, statistics, alarms and events) for enhanced traffic management, monitoring and analysis.
  • Support for all nine RMON groups that permits traffic monitoring of a single port, a group of ports, or the entire switch from a single network analyzer.
 
   
23- Is the NMS required to manage the Firewall / IDS software on all the routers?  
 
  • See Tender Dossier Part I / Item 1.30 / Page 44
 
   
24- An Internet link is required, but no router. Does the router already exist? If yes, what is its type, model and configuration? If no, what are its required specifications?  
 
  • Yes, it is already exists and is equipped with 2 serial ports.
 
   
25- Should Clustered and Network Load Balanced functions be achieved with Windows Enterprise Edition and /or Layer 4 Backbone switch?  
 
  • All Servers listed in Table:1 should be supplied with the following
  • The latest appropriate version of Operating System (e.g. Windows server 2003 Std. / Enterprise Edition, UNIX …etc.) to achieve the primary role assigned to it and to let Network load balancing or Clustering be fully operational.
  • The necessary HW/SW needed for clustering or Network load balancing operation to be achieved successfully.
  •  The latest version of :-
     MS Exchange Enterprise Edition.
     MS ISA Enterprise Edition (License per processor).
     MS SQL Standard Edition (License per processor)
     
  • The needed Patch Cables necessary for connecting servers to Core switches.
    See Tender Dossier Part I / Page 8
     
 
   
26- Is the Back-up software part of scope of LOT1  
 
  • No, Back-up software is part of scope of LOT2; However LOT1 & LOT2 should be fully integrated and operational as mentioned in scope of work for both LOT1 & LOT2.

    See Tender Dossier Part II / Page 6 & 53
 
   
27- Item 1.2 Server Computer (SC -02), please confirm if it is possible that the total cache will be 4 MB instead of 8MB  
 
  • No, It is not possible
 
   
28- Item (1.9) Storage Area Network, Please specify if it’s possible to achieve the 8 TB without using the same disk drives  
 
  • No, It is not possible
 
   
29- Please confirm that it is possible to offer a SAN (Item 1.9) with 4 ports instead of 8 and 2 SAN switches with 16 ports instead of 3 with 8 ports.  
 
  • No, It is not possible
 
   
30- Regarding SAN (Item 1.9),Could number of LUNs to be 1024 instead 2048 LUN  
 
  • No, It is not possible
 
   
31- Regarding SAN (Item 1.9), please state the minimum required IOPS  
 
  • 140,000 IOPS at least is required.
 
   
32- Item 1.10 Backup Tape Library, Please confirm that the hot swappable and hot pluggable features are not mandatory.  
 
  • Hot swappable and hot pluggable features are mandatory.
 
   
33- Regarding Personal computers (PC-01) & (PC-02) what is meant by Tower/desktop?  
 
  • Tenderer have the choice to offer either desktop or tower.
 
   
34- Regarding Item 2.6 Storage Management Software (Backup Software) should all servers connected to SAN to be backed-up on-line (hot backup)?  
 
  • Yes, all servers connected to SAN should be backed-up on-line (hot backup).
 
   
35- In Page # 52 of 74, the backup software to be installed on the (File & Print Server) which are “two clustered servers”, does this means the backup software must be cluster aware and its service fail-over to be enabled inside the cluster services management, and the backup environment’s settings to be on the cluster shared storage.  
 
  • Yes, it means that backup software must be cluster aware and its service fail-over to be enabled inside the cluster services management, and the backup environment’s settings to be on the cluster shared storage, or another meaning.
 
   

 

Copyright © 2001 Social Fund for Development Egypt All rights reserved

   SEDO

Small
Enterprise
Development
O
rganization
more...
  Tenders
New Management Information System-Hardware            more...
 
 Strategy
SFD Vision&  Plans          more...
   Diary

Stories &
V
ideo for SFD
beneficiaries
more...

   Press
Annual report,
News letter,..
         more...